The results of the implementation of the collective agreement for 9 months of 2020 have been summed up at JSC “Turboatom”. The meeting of the administration and the trade union committee was attended by managers and trade union activists of the workshops and divisions of the plant.
During the reporting period, the enterprise fulfilled its contractual obligations, concluded contracts, and made payments to the budgets of all levels. In general, the production plan and the collective agreement measures have been fulfilled. Since the beginning of the year, a large amount of work has been carried out to manufacture products for Zaporizhzhya, South Ukrainian, Rivne NPPs (Ukraine), Aksu TPP (Kazakhstan), Paks NPP (Hungary), Kozloduy NPP (Bulgaria), Armenian NPP (Armenia), Dniester PSPP, Dnipro-2 HPP, Kyiv PSPP, Kaniv HPP (all - Ukraine).
One of the most important tasks is the quality of products at all stages of activity - from design to shipment of products. During the reporting period, a lot of work was done to upgrade and modernize equipment.
With the aim of timely and high-quality fulfillment of the production plan, increasing production cycles and improving working conditions, the investment program of technical re-equipment of JSC “Turboatom” was ensured. In particular, the copy-milling machine “Forest” in workshop 55 was modernized. More than 10 pieces of equipment were repaired: a horizontal boring machine with CNC of “Skoda” company (workshop 53), a vertical milling machine with CNC IS800PMF4 (workshop 55), a special grinding machine of “Faros Blatter” company (shop 83) and crane equipment in the workshops of the enterprise.
All this makes it possible for the company's products to compete in the global power equipment market.
Particular attention is paid to the training of workers involved in the manufacture of certified products: turners, milling-machine operators, electric welders, NDT inspectors, heat treatment operators, QCD inspectors. Since the beginning of the year, 63 people have been trained, including 12 machine operators; improved their qualifications - 275 people. Also, 91 students and pupils of educational institutions of Kharkiv passed practical training.
In the reporting period, measures were taken to prevent accidents and occupational diseases during work.
Preliminary and periodic medical examinations of the employees of the enterprise took place systematically; special attention was paid to workers working in hazardous working conditions. These workers were provided with milk and fruit juices. Workers whose work is pollution-related were provided with soap, overalls, gloves and personal protective equipment.
The repair work of the roofs of the production and service buildings of the enterprise is continued. An expert survey of electric bridge cranes is being carried out. The heating of the marking plate of section No. 2 in workshop 64 was restored, technical documentation was developed, a protective guard for the clutch of the electric motor shaft and the gearbox was manufactured and installed on the machine in workshop 53. Also, training and testing of knowledge on labor protection issues are carried out for workers performing high-risk work.
For the timely preparation of the enterprise for the autumn-winter period, work was carried out on the repair of buildings and structures, energy communications, vehicles and storage facilities. The enterprise was prepared for the heating season on time.
The workers of the enterprises regularly took part in the organization of amateur concerts and sports events. 154 athletes took part in the competition during the ninth annual Spartakiad, held in compliance with all the necessary requirements for holding mass sports events during quarantine. In particular, in the tournament among the enterprises of Kharkiv “Battle of Corporations” the combined team of “Turboatom” took the second place according to the results of the fifth season.